With the increasing spread of Covid 19 activities underground have finished for the foreseeable. This is additionally frustrating with leaving such a wide open lead at the bottom of Intake Dale Mine, but at least that gives the team something to be dreaming about whilst stuck at home
This break has given the team the chance to update the drawn survey, albeit it still very much work in progress with large parts awaiting being surveyed including a large section of the cartgate and the impressive Isolation. The survey so far can be downloaded from the Club's open survey page:
http://www.eldonpotholeclub.org.uk/homepage/club-history/surveys